Back to Part-3 | Main | Next

Table of Contents
Name & Description Time
Sheet1 ALPENA HARBOR, MI- Section Included: Lower 4,000 feet of river and private harbors north of mouth of Thunder Bay River. Controlling Depth: 21 feet in the bay section; 17 feet in river; 15 feet in turning basin. Project Depths: channel 21 feet deep from that depth in Thunder Bay to a point 2,500 feet lakeward of the lighthouse; thence 18.5 feet in river narrowing to 100-foot width at a point 700 feet upstream from the lighthouse; thence 100 feet wide and 18.5 feet deep to the Second Ave. B ridge; thence 18.5 feet deep and 75 feet wide to the upper limits of the project; a turning tasin 15 feet deep by 3.7 acres at the upper end of project; and a turning basin 18.5 feet deep at the river mouth. Navigation season: March 15 to December 17. CY2007
Sheet2 ASHLAND HARBOR, WI- Section Included: Entire harbor. Controlling and Project Depths: 27 feet in about westerly half of east basin and approach thereto, 25 feet in remainder of east basin, and 21 and 20 feet in the channel in western portion of the harbor. Controlling Depth: 20 feet along the southern portion of the 21 foot project depth area. Navigation Season: May 13 to November 26. CY2007
Sheet3 ASHTABULA HARBOR, OH- Section Included: Outer harbor and Ashtabula River from mouth to and including city of Ashtabula Dock (Former Great Lakes Engineering Works Dock), 1.75 miles. Controlling Depth: Westerly portion of outer harbor to inner breakwater& approach channel to docks east of inner breakwater, 26.0 feet turning basin in front of inner breakwater 21.5 feet; the approach to the Penn. Central Railroad Company's slip and the lower 2,000 feet of the Ashtabula River, 23 feet; thence to car ferry slip, 10 feet; thence to a point 1,550 feet upstream from turning basin and including turning tasin, 3 feet. Project Depth: Entrance channel, 29 feet; westerly portion of outer harbor to inner breakwater, 28 feet; Approach Channel to docks east of inner breakwater, 28 feet; turning basin in the easterly portion of the outer harbor, 22 feet; channel from inside the Inner Breakwater to mouth of river and 2,000 feet upstream and approach channel to Penn. Central Railroad Company's  slip, 27 feet; thence to car ferry slip, 18 feet; thence to a point 1,550 feet upstream from turning basin and including turning basin, 16 feet. CY2007
Sheet4 BAYFIELD HARBOR, WI- CY2007
Sheet5 BUFFALO HARBOR, NY (INCLUDED IN PORT OF BUFFALO)- Section Included: Outer harbor, Lackawanna Canal, Union Canal. Buffalo River from mouth to Conrail R. Y. Bridge, 5.5 miles. Buffalo Ship Canal, and Black Rock Canal to the Black Rock Lock. Controlling Depths: Outer area of south entrance channel, 30 feet; south entrance channel 29.0 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south breakwater and  proceeding northerly 4,200 feet, 23 feet; thence 27 feet to the International Salt Company and 23 feet in the remainder of the outer harbor to the north; new north entrance channel, 25 feet; Black Rock Canal, 21 feet; Buffalo River Entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Project Depth: Outer area of south entrance channel, 30 feet; south entrance channel 29 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south breakwater and proceeding northerly 4,200 feet, 23 feet. Middle section of the outer harbor, 27 feet; north outer harbor, 23 feet; north entrance channel, 25 feet; Buffalo River entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Black Rock Canal, 21 feet. CY2007
Sheet6 BUFFINGTON HARBOR, IN- CY2007
Sheet7 BURNS WATERWAY HARBOR, IN- Section Included: Approach channel, outer harbor, and two harbor arms. Project Depth: 30 feet in approach channel, 28 feet in outer harbor, and 27 feet in the east and west harbor arms. CY2007
Sheet8 CALCITE, MI- CY2007
Sheet9 CHARLEVOIX HARBOR, MI- Section Included: Entrance channel and entire area of Round Lake and Lake Charlevoix, including Advance, Boyne City and East Jordan. Controlling Depth: 18 feet. Project Depth: 23 feet. CY2007
Sheet10 CHEBOYGAN HARBOR, MI- Section Included: Entrance channel and 3,500 feet of river. Controlling Depth: 21 feet to East First Street, including turning basin, and 18.5 feet to the State Road Bridge. Project Depth: 21 feet to East First Street; 18.5 feet to the State Road Bridge; 8.5 feet above the State Road Bridge to Lock in Cheboygan River; 21 feet in turning basin. Navigation season: 14 April to 9 December. CY2007
Sheet11 CHICAGO HARBOR, IL (INCLUDED IN PORT OF CHICAGO)- Section Included: Protected area on lakefront from Oak Street to Roosevelt Road and Chicago River entrance to Rush Street. Project Depth: 29 feet in the lake approach channel, 28 feet in the channel and maneuver area to the east end of Navy Pier, then 21 feet in the approach to the lock and in the Chicago River entrance to Rush Street. CY2007
Sheet12 CLEVELAND HARBOR, OH- Section Included: Outer Harbor, Old River and Cuyahoga River from mouth to and including Upper Republic Steel Corp. Dock, immediately downstream from Norfolk & Western Railway Bridge, 5.8 miles. Controlling Depth: Lake Approach Channel, 29 feet; entrance channel, West Basin and westerly 800 feet of East Basin, 28 feet; easterly 3800-foot length of East Basin, 27 feet; 500-foot channel through East Outer Harbor, 25 feet; channel between piers to Conrail Railroad Bridge, 27.0 feet; channel in Cuyahoga River from Penn Central Railroad to upperproject limit, 22 feet; turning basin upstream from E.I. Dupont De Nemours And Company, Inc., Grasselli Chemical Division Dock, 19.5 feet; Old River to Sand Products Corporation Dock, 23 feet; remainder of Old River to upper project limit, 14 feet. Project Depth: Lake Approach Channel, 29 feet; West Basin, entrance channel and west end of East Basin, 28 feet; remaining 3800-foot length of East Basin, 27 feet; 500-foot ch annel through East Outer Harbor,25 feet; lower Cuyahoga River from lakeward ends of the piers to immediately above junction with Old River, 27 feet; Old River to upper project limit, 27 feet; remainder of Cuyahoga River, 23 feet; turning basin upstream from E.I. Dupont De Nemours and Company, Inc., Grasseli Chemical Division Dock, 18 feet. CY2007
Sheet13 CONNEAUT HARBOR, OH- Section Included: Outer harbor and Conneaut River 2,450 feet upstream of the outer end of the West Pier. Controlling Depth: Westerly portion of outer harbor, 20.5 feet; access channel to city dock, 7.5 feet; easterly portion of outer harbor 23 feet. Inner Harbor, 28. feet; Project Depth: Easterly portion of outer harbor, 28 feet; westerly portion of outer harbor, 22 feet; access channel to city dock 8 feet: Inner Harbor, 27 feet. CY2007
Sheet14 DETROIT HARBOR, MI (INCLUDED IN PORT OF DETROIT)- Section Included: U.S. bank of Detroit River from Lake St. Clair to western extreme of Zug Island. Controlling Depth: Channel north of Belle Isle 21 feet, remainder of river 25-28.5 feet. Project Depth: 28.5 feet except channel north of Belle Isle, 21 feet. CY2007
Sheet15 DETROIT HARBOR, WI- CY2007
Sheet16 DRUMMOND ISLAND, MI (INCLUDED IN ST. MARYS RIVER)- Section Included: Private loading dock on St. Marys River at Drummond Island, MI. Controlling Depths: 30 feet to and from Lake Huron; 27.0 feet to and from Lake Superior; 27.0 feet to Lake Superior; 23 feet at dock. Project Depth: See St. Marys River. CY2007
Sheet17 DULUTH-SUPERIOR HARBOR, MN AND WI- Section Included: Superior Bay and its tributaries, St. Louis Bay and St. Louis River, and Allouez Bay. Controlling Depth: 32 feet in lake approaches, diminishing to a minimum of 20 feet in certain inner channels; there are numerous 1-2 foot shoals scattered in portions of the Duluth and Superior Harbor Basins. Project Depth: 32 feet in lake approaches; 27 feet in Duluth and Superior Harbor Basins, superior front channel, and in ore-channel routes through north and south channels to D. M. & I. R. R.Y. ore docks; 27 feet in Howards Bay and Allouez Bay; 23 feet in remaining portion of south, upper, and Minnesota channels to Hallet Dock No. 6; and 20 feet from thence to northerly end of Clough Island. Navigation Season: April 3 to January 11. CY2007
Sheet18 ECORSE, MI (INCLUDED IN PORT OF DETROIT)- Section Included: U.S. shore of Detroit River from Great Lakes Avenue. to Ecorse River. Controlling Depth: 26.5 feet. Project Depth: 28.5 feet. CY2007
Sheet19 ERIE HARBOR, PA- Section Included: Southerly side of Erie Harbor and Lake Erie water frontage from harbor entrance eastward to and including Sun Oil Co dock, 3.5 miles. Controlling Depth: Entrance channel, 29 feet; channel to easterly coal and ore docks, 27 feet; and 27 feet to the Port Authority Dock; harbor basin, 21 feet; westerly portion of harbor, 18 feet. Project Depth: Entrance channel, 29 feet; Approach Channel to easterly coal and ore docks, 28 feet; approach to Port Authority D ocks, 27 feet; Harbor Basin, 21 feet; westerly portion of Harbor Basin, 18 feet. The approach channel from the 28 foot channel to and including turning basin at westerly docks has been authorized, but never completed and considered inactive at the present time. CY2007
Sheet20 ESCANABA, MI- CY2007
Sheet21 FAIRPORT HARBOR, OH- Section Included: Outer harbor and Grand River from mouth to and including Diamond Alkali Company Stone Dock, 1.5 miles. Controlling Depths: Entrance Channel, 24 feet; Outer Harbor, 24.0 feet; Grand River to upstream of Republic Steel, 19.0 feet; remaining length of Grand River to the upper project limit, 19 feet; except for 1,000 feet of the upstream end of the west side of the channel, 5 feet; turning basin, 15 feet. Maintenance Depths: Entrance channel and outer ha rbor, 25 feet; Grand River to upstream of Republic Steel, 24 feet; remaining length of Grand River to the upper project limits, 21 feet: turning basin, 18 feet. CY2007
Sheet22 GARY HARBOR, IN- CY2007
Sheet23 GLADSTONE HARBOR, MI- Section Included: Entire harbor including Kipling, Mich. Controlling and project depths: 24 feet at Kipling Channel & Turning Basin. CY2007
Sheet24 GRAND HAVEN HARBOR AND GRAND RIVER, MI- Section Included: Entire harbor, including Ferrysburg and Spring Lake; and Grand River from Grand Trunk RY. Bridge at Ferrysburg to Bass River about 15 miles. Controlling Depths: 22 feet in entrance channel; 21 feet to the mouth of the south channel; 21 feet to the sag; 20 feet to Grand Trunk RY. Bridge at Ferrysburg; 18 feet in the Turning Basin; 17 feet in channel to Spring Lake; thence 8 feet to mile 17.0 and 5 feet to the end of the project. Proj ect Depths: 23 feet in entrance channel; 21 feet to Ferrysburg; 18 feet in channel to Spring Lake; 8 feet to mouth of Bass River. Navigation season: March 1 to December 31. CY2007
Sheet25 GREEN BAY HARBOR, WI- Section Included: Outer channel, channel through the city of Green Bay and upper river channel to city of De Pere. Controlling and project depths: 26 feet in outer channel to Grassy Island; 24 feet in the entrance channel and river channel to a point 1,700 feet upstream from the C. & N. W. R. R. Bridge; 24 feet in the turning basin at the mouth of the East River; 20 feet in the turning basin above the C. & N. W. R. R. Bridge; 18 feet in the upper river channel and turn ing basin at the city of De Pere. CY2007
Sheet26 HARBOR BEACH, MI (HARBOR OF REFUGE, LAKE HURON)- Section Included: Entrance channel and anchorage area at Harbor Beach, Mich. Controlling Depth: 20 feet in the entrance channel, 14 to 16 feet in the anchorage area. Project Depth: 23 feet in the entrance channel; 21 feet in the anchorage area. Navigation season: 20 April to 14 December. CY2007
Sheet27 HOLLAND HARBOR, MI- Section Included: Controlling Depths: Entrance channel - 23 feet decreasing to 20 feet at the outer end of the inner pier; thence a controlling depth of 19 feet for a channel through Lake Macatawa to the wharves in Holland, Michigan, a Turning Basin 18 feet deep, a channel in Black River 21 feet deep and a settling basin with a project depth of 17 feet above the Black River channel to the State Street Bridge. Navigation season: March 13 to December 31. CY2007
Sheet28 HURON HARBOR, OH- Section Included: Lake approach channel from deep water to a point opposite the outer end of east breakwater; entrance channel from its junction with the approach channel to its junction with the River Channel; River channel and turning basin to within 1,500 feet of the Penn Central Railroad Bridge. Controlling Depths: Lake approach and entrance channel, 27.5 feet; river channel, 27 feet; turning basin, 21 feet. Project Depths: Lake approach and entrance channels, 29 feet ; river channel to Slip No. 1, 28 feet; from Slip No. 1 through eastern portion of the turning basin, 28 feet; turning basin, 22 feet. CY2007
Sheet29 INDIANA HARBOR, IN- Section Included: Approach channel, outer harbor and canal entrance channel to the first E. J. & E. R. R. Bridge: Indiana Harbor Canal, including the Calumet River Branch to Columbus Drive Bridge and the Lake George Branch to 0.2 miles past Indianapolis Blvd. Project Depth: 29 feet in approach channel, 28 feet in harbor basin, 27 feet in canal entrance channel, and 22 feet in remainder of canal to 0.2 miles past Indianapolis Blvd. on Lake George Branch and Columbus Drive on Calumet River Branch. CY2007
Sheet30 KELLEYS ISLAND, OH- Section Included: Entire area of Kelleys Island, Ohio. Controlling Depth: Unimproved, natural depths unknown. Project depth: Approach channel, 12 feet; Entrance channel, 10 feet; and remainder of channel, 8 to 10 feet. CY2007
Sheet31 LA POINTE HARBOR, WI- CY2007
Sheet32 LAKE CALUMET, IL (INCLUDED IN PORT OF CHICAGO)- Section Included: Entrance channel from the Calumet River to a harbor area at south end of lake with a channel extending northward for a distance of 3,000 feet and a width of 1,000 feet. Project Depth: 27 feet. CY2007
Sheet33 LORAIN HARBOR, OH- Section Included: Outer Harbor and Black River from mouth to and including United States Steel Corp., National Tube Division dock, 3 miles. ControllingDepths: Lake Approach channel, 27.0 feet; A channel 800 feet wide through the Outer Harbor, 27 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 25 feet; remainder of River Channel 24 feet except turning basinjust downstream of the 21st Street Bridge which is 12 to 19 feet and the returning Basin  opposite the U. S. Steel Corp., National Tube Division which is 12 to 20 feet. Project Depths: Lake Approach Channel, 29 feet; a channel 800 feet wide through the Outer Harbor, 28 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 28 feet; remainder of River Channel, 27 feet; except turning basin downstream of 21st Street Bridge, 20 feet and turning basin opposite U. S. Steel Corp., National Tube Division Dock, 21 feet. CY2007
Sheet34 LUDINGTON HARBOR, MI- Section Included: Entrance channel and entire area of Pere Marquette Lake. Controlling Depths: 26 feet in the outer entrance bar and 27 feet in the channel to Pere Marquette Lake. Project Depths: Outer entrance channel, 30 feet; inner entrance channel, 29.5 feet; channel to Pere Marquette Lake, 29 feet; north and south mooring basins, 18 feet. Navigation season: April 2 to December 31. CY2007
Sheet35 MACKINAC HARBOR, MI- CY2007
Sheet36 MANISTEE HARBOR, MI- Section Included: Entrance channel and entire area of Manistee Lake, including Filer City. Controlling Depths: 24 feet over the entrance bar, through the outer basin and in the channel between the piers; thence 23 feet in the river channel, narrowing to a minimum width of about 100 to 140 feet to Manistee Lake. Project Depths: 25 feet in the outer basin and 23 feet in the river to Manistee Lake. Navigation season: March 30 to December 31. CY2007
Sheet37 MANISTIQUE HARBOR, MI- CY2007
Sheet38 MANITOWOC HARBOR, WI- Section Included: Outer harbor and lower 2 miles of river. Controlling and project depths: 21 feet in the Lake Approach Channel, the outer harbor, and in the river channel to the Third Railway Bridge. CY2007
Sheet39 MARBLEHEAD, OH- CY2007
Sheet40 MARINE CITY, MI (INCLUDED IN ST. CLAIR RIVER)- CY2007
Sheet41 MARQUETTE HARBOR, MI- Section Included: Entire harbor. Controlling Depth: 26 feet. Project Depth: 27 feet. Navigation Season: May 14 to November 22. CY2007
Sheet42 MARYSVILLE, MI (INCLUDED IN ST. CLAIR RIVER)- Section Included: West bank of St. Clair River at Marysville, MI. Controlling Depth: 27.4 feet. Project Depth: at low-water datum; 27.4 feet to and from Lake Huron; 27.1 feet downbound to Lake St. Clair. CY2007
Sheet43 MENOMINEE HARBOR AND RIVER, MI AND WI- Section Included: Entrance channel and lower 2.0 miles of Menominee River. Controlling and project depths: 20 feet controlling depth, 23 feet project depth in the Approach Channel; 18 feet controlling depth, 21 feet project depth in the entrance and river channels, 19 feet in the river adjacent to the Marinette Marine Corp., 12 feet to the end of the project, and 18.5 feet controlling depth, 21 feet project depth in the Turning Basin. CY2007
Sheet44 MILWAUKEE HARBOR, WI- Section Included: Lake Approach Channel, outer harbor, Milwaukee River to Buffalo Street, lower 2 miles of Menomonee River, lower 2 miles of Kinnickinnic River and South Menomonee and Burnham Canals. Controlling and project depths: 30 feet in Lake Approach Channel, 28 feet in the entrance channel and the south outer harbor, 21 feet in the north outer harbor, 27 feet in the Kinnickinnic River to the Chicago and North Western Railway Bridge at mile 1.0, thence 21 feet to  South Kinnickinnic Avenue Bridge; 27 feet in Milwaukee River to the Chicago and North Western Railway Bridge at mile 0.21, thence 21 feet to East Buffalo Street Bridge; 21 feet in Menomonee River and South Menomonee and Burham Canals. CY2007
Sheet45 MONROE HARBOR, MI- Section Included: Channel in Lake Erie and 16,000 feet above Raisin River.Controlling depth: 20 feet to turning basin over a center width of 150 feet; 16.5 feet in turning basin except near the shore; 5.5 feet in 9 foot channel. Project Depth: 21 feet to the turning basin; 18 feet in the turning basin; 9 feet to lower docks at Monroe. Navigation season: Approximately 20 April to 14 December. CY2007
Sheet46 MUSKEGON HARBOR, MI- Section Included: Entrance channel and entire area of Muskegon Lake. Controlling Depths: 29.0 feet through the outer portion of project and 27 feet in channel to Muskegon Lake. Project Depth: Varying from 29.0 feet at harbor entrance to 28 feet between breakwaters and 27 feet in inner channel. Navigation season: April 7 to December 31. CY2007
Sheet47 NIAGARA RIVER, NY (INCLUDED IN PORT OF BUFFALO)- Section Included: Black Rock Channel north of the Black Rock Lock and Niagara River to and including American Oil Co. dock, 0.5 mile south of the Tonawanda city line, the northern limit of the Niagara River section of the Port of Buffalo. Controlling and Project Depths: 21 feet. CY2007
Sheet48 OGDENSBURG HARBOR, NY- Section Included: St. Lawrence River Frontage from vicinity of Lake Street Bridge to inner end of Ogdensburg Bridge and Port Authority Dock near Barre Street; upper entrance, city front and lower east entrance channels and lower basin. Controlling Depth: Upper entrance, city front and lower entrance channels, 19 feet; lower basin, 21 feet. CY2007
Sheet49 ONTONAGON HARBOR, MI- Section Included: Mouth of Ontonagon River, MI. Controlling Depth: 19 feet in lake approach, 19 feet between entrance piers, and 15 feet in Harbor Basin. Project Depth: 19 feet in lake approach and 19 feet between entrance piers, and 15 feet in inner basin. CY2007
Sheet50 OSWEGO HARBOR, NY- Section Included: Outer Harbor and Oswego River from mouth to Seneca Street. Controlling Depths: Lake approach channel, 27 feet; channel through outer harbor, 24 feet; east and west side of outer harbor, 21 feet; Oswego River channel, 24 feet. Project Depths: Lake approach channel, 27 feet; channel through outer harbor, 25 feet; lower 1,600 feet of Oswego River channel, 24 feet; remainder of Oswego River channel and Oswego Harbor, 21 feet. CY2007
Sheet51 PORT DOLOMITE, MI- CY2007
Sheet52 PORT GYPSUM, MI- CY2007
Sheet53 PORT INLAND, MI- CY2007
Sheet54 PORT OF BUFFALO, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal, Buffalo River from mouth to Conrail RY Bridge 5.5 miles, Buffalo Ship Canal, Black Rock Canal, Black Rock Lock, Black Rock Channel, Niagara River, and Tonawanda to and including Buffalo Oil Terminal, Inc. Dock, located about 2,000 feet north of turning basin, Tonawanda inner Harbor, and Tonawanda Creek Channel from mouth to Main Street Bridge. Controlling and Project Depths: See Buffalo Harbor, Niagara River  and Tonawanda. CY2007
Sheet55 PORT OF CHICAGO, IL- Section Included: Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Project Depth: See Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. CY2007
Sheet56 PORT OF DETROIT, MI- Section Included: Detroit Harbor, Rouge River, Ecorse, Wyandotte, Riverview and Trenton. Controlling and Project Depths: See aforementioned project descriptions. CY2007
Sheet57 PRESQUE ISLE HARBOR, MI- Section Included: Entire harbor. Controlling and Project Depths: 30 feet in approach and 28 feet in basin. Navigation Season: March 31 to January 21. CY2007
Sheet58 PUT-IN-BAY HARBOR, OH- CY2007
Sheet59 RACINE HARBOR, WI- CY2007
Sheet60 ROCHESTER (CHARLOTTE) HARBOR, NY- Section Included: Genesee River from mouth to and including Genesee Docks,3 miles. Controlling Depth: Approach and entrance channels 19.0 feet; lower turning basin 17.0 feet. remainder of Genesee River 11 feet except for westerlyhalf of upper turning basin which has not been maintained for several years 4 feet; and portion of channel upstream of Rochester Portlandc Cement Dock, 12 feet. project depths: Approach channel, 24 feet; entrance channel between pi ers to Conrail Railroad Bridge, 23 feet; remainder of Genesee River, 21 feet. CY2007
Sheet61 ROUGE RIVER, MI (INCLUDED IN PORT OF DETROIT)- Section Included: From the mouth of the Short Cut Canal to the Ford Motor Company. Controlling Depth: 20 feet for a minimum width of 100 feet from the mouth of the short cut to Dix Avenue Bridge, with the exception of some shoal areas, and 20 feet in the turning basin, except near the shore. Project Depth: 21.0 feet from mouth of Short Cut Canal to and including the turning basin in main channel. CY2007
Sheet62 SAGINAW RIVER, MI- Section Included: From the mouth of the river up to and including Sagainaw, Michigan. Controlling Depths: 27 feet from the 25 foot contour in Saginaw Bay to 26 feet at the river mouth, 4 feet miscellaneous shoaling along channel limits; thence 24 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw, Michigan; thence 14 feet to the Holland Street Bridge; thence about 7 feet over a width of 100 feet upstream to Green Point (this section not  maintained). Controlling depths in turning basins are: Essexville - 23 feet north side, 22 feet south side; Airport - 21 feet; Carrollton - 19 feet; Sixth Street - 20 feet; basin at 19 mile point - 15 feet. Project Depths: 27 feet from the deep water in Saginaw Bay to the river mouth; thence 26 feet for 0.4 mile; thence 25 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw; thence 16.5 feet to the upstream limits at Green Point. 20 and 25 feet in Essexvil le Turning Basin; 22 feet in the Airport turning basin; 20 feet in the Carrollton Turning Basin; 20 feet in the Sixth Street Turning Basin and 15 feet in the Turning Basin at the 19 mile point. Navigation season: March 24 to December 31. CY2007
Sheet63 SANDUSKY HARBOR, OH- Section Included: Southeasterly portion of Sandusky Bay to and including passenger docks on Cedar Point. Controlling Depth: Mosely Channel, 26 feet; Bay Channel and Straight Channel from Mosely Channel to junction with Bay Channel, 25.0 feet; turning basin, 24 feet; Dock channel, 21 feet; Straight channel from dock channel to junction with Bay Channel, 21 feet. Project Depths: Mosely Channel, 26 feet; bay channel and Straight Channel from Mosely Channel to junction wi th Bay Channel, 25 feet; turning basin, 24 feet; Dock channel, 22 feet; and straight channel from dock channel to junction with Bay Channel, 21 feet. CY2007
Sheet64 SAULT STE. MARIE, MI (INCLUDED IN ST. MARYS RIVER)- CY2007
Sheet65 SILVER BAY, MN- CY2007
Sheet66 ST. CLAIR, MI (INCLUDED IN ST. CLAIR RIVER)- Section Included: West bank of St. Clair River at St. Clair, MI Controlling Depth: 27.3 feet. Project Depth: 27.3 feet. CY2007
Sheet67 ST. JAMES (BEAVER ISLAND), MI- CY2007
Sheet68 ST. JOSEPH HARBOR, MI- Section Included: Entrance channel and lower portion of St. Joseph River to and including Benton Harbor Canal. Controlling Depth: 24 feet at entrance; 21 feet between entrance piers and in the river to the mouth of the Paw Paw River; with miscellaneous of shoaling along the channel limits; 17 feet in the Turning Basin; and 16 feet at Benton Harbor Canal. Project Depths: 24 feet at entrance, and 21 feet in channel and river to the mouth of the Paw Paw River; 18 feet  in turning basins and the Benton Harbor Canal. Navigation season: March 7 to December 31. CY2007
Sheet69 STONEPORT, MI- CY2007
Sheet70 TACONITE HARBOR, MN- CY2007
Sheet71 TOLEDO HARBOR, OH- Section Included: Channel in Lake Erie and 7 miles in lower Maumee River. Controlling Depths: 28 feet in the Bay Channel; 27 feet in The River Channel to the turning basin opposite the Mid-States Terminals, Inc. dock; thence 14 feet to the turning basin at the upper project limits with 13 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in the turning basin at mile 6.5, project depths: 28 feet in bay and 27 feet in the river channel to the tu rning basin opposite the Mid-States Terminals, Inc. dock; thence 25 feet to the turning basin at upstream limits of the project with 18 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in turning basin at mile 6.5. Navigation season: Approximately March 1 to December 31. CY2007
Sheet72 TRAVERSE CITY HARBOR, MI- Section Included: City of Traverse City and the Bay Shore to and including the existing federal project located at Greilickville Hbr., Michigan, about 1.25 miles north of the city limits. Controlling Depth: 14 and 10 feet at the existing project. Project Depth: 14 feet in basin area and 10 feet in mooring area at the existing project. Navigation season: March 4 to December 31. CY2007
Sheet73 TRENTON, MI (INCLUDED IN PORT OF DETROIT)- Section Included: U.S. shore of Detroit River from foot of Sibley Road to foot of Parkway Drive. Controlling and Project Depths: 28 feet. CY2007
Sheet74 TWO HARBORS (AGATE BAY), MN- Section Included: Entire harbor. Controlling Depth: 28 feet except for a 26 foot area along the east project line. Project Depth: 28 feet in inner basin and 30 feet near entrance. CY2007
Sheet75 WAUKEGAN HARBOR, IL- Section Included: Artificial harbor basin of about 13.5 acres and entrance channel from Lake Michigan approximately 2,200 feet in length. Project Depth: 22 feet in entrance channel; 18 feet between piers and inner basin; 8 feet in anchorage area of approximately 6 acres. CY2007
Sheet76 WYANDOTTE, MI (INCLUDED IN PORT OF DETROIT)- Section Included: U.S. shore of Detroit River from Ecorse River to and including the Pennsalt Chemical Corp's property. Controlling Depth: 27 feet. Project Depth: Rock area 28 feet, earth area 27 feet. CY2007